Green
Team - meeting notes – 11/10/2016
SC Green
Team
Attendees:
Candy Dann, Mark Bohrer, Fran Fink, Janet Clarke, Steve Fink
-
ACTIONS: Mark – talk to Dana
o review
proposed plans and possible dates for internal 1-day retreat Fall 2017
o All-Generation
big retreat Fall 2018
o Green
Movie Night – Possible Dates - Jan 29
-
ACTIONS: Steve – talk to Highland
-
Next meeting – December 15th – move
meeting to 3rd Thursdays!
o ACTION : Mark – tell Linda Hacker
1) Agenda/Minutes
o Green
Retreat for the Future 2.0
§ Plan for
Fall 2018!
·
Market as Family Christmas gift December 2017
§ Similar
format & structure
§ Guest
speaker
o In House
Multi-generational event – September 2017
§ Afternoon
internal retreat – science fair
§ Lead in
to Harvest Dinner
§ Speaker is
a readout on the projects?
§ Speaker
is UCS, John Rogers
§ Can have
kids activities
o Need
long term green church investment plan
§ Present
to Trustees
§ Start
with 3 renovations below
o Christmas
Table 2017
§ Sell LED
lights
§ Re-usable
o Workshop
on energy efficiency
§ LED
Lighting
§ Sealing
& Insulation
2) Green
Movie Night – do together with North Parish, West Parish
a. Possible
Dates -
i.
Jan 29 Sunday
ii.
Feb 12 & Feb 19
iii.
Mar 11th Saturday
3) Church
energy efficiency
3 energy
conservation renovations projects - Iric
Here are some steps to improve energy performance at
SC:
Determined 3 fairly easy renovations to help with
energy use.
Talked with Tom Ozirsky about the budget for each, as he was putting together
this year’s budget.
Talked with Betsy Davis about the 3 things, but
still want to get her comments/ opinions.
Talked with Wally about the 3 things.
I think one or more of them, if Betsy approves,
would make good DOS activities.
The three renovations:
1.
Airseal and insulating panel at men’s bathroom exhaust fan (near stairs
at front of church). There is significant heat loss (and an uncomfortably cold,
drafty bathroom) at this location. Budget $100 for materials.
2. Airseal and insulate at large inter-wall space at
front of Sanctuary (both sides). There appears to be a large volume of heated
air that travels through this space from the boiler room/ lower floor area up
through the attic. Budget $700 for materials.
3. Apply
rigid insulation to the bare concrete wall on the back side of the church,
basement level, Rompers area. Refinish with GWB. The wall is presently
uninsulated, and is an area of great heat loss. The insulation will cut heat
loss and also improve comfort in the room. Budget $1,800 for materials. Will
also require some time from a plumber (to move hydronic convectors away from
the wall) and electrician (to move wall-mounted electrical). Budget $2,500 for
trades? Total guess.
- Possible use of Black Dog basement insulation
system?
All budget costs are rough estimates. I assume all
labor would be donated, except for plumbing and electrical.
Hello
Green Team:
Here is
a summary of the meeting that Candy and I had with Kate Jagger yesterday
regarding fossil fuel divestment. It's
my notes. Candy has not had time to
offer her edits. But I wanted to get
this in your hands before tonight's Green Team meeting, so you all would have
something to think about.
See you
tonight,
Bill
No comments:
Post a Comment
The South Church Green Team blog is a moderated blog. We welcome your comments and feedback.